Tower project setback - Rain Delay
Central Iowa has had an abnormal amount of rain this month. So much in fact that there has been a problem with drainage in our part of the county. At one point, we had some water in the basement (thankfully, there was minimal damage - mostly some wet boxes of clothes). We believe that a drainage tile may have been damaged or plugged leading to water backing up into our foundation tile.
Anyway, the result is that all of this has led to a delay in the tower project. Finding the right concrete guy has also been a challenge, but right now, even if I had someone to pour concrete, the ground is way too soft to have heavy equipment.